Laserfiche WebLink
Susan Burgmaier -4- June 17, 2014 <br />Culvert C -F4. Reviewing the currently approved reclamation cost estimate, Task 165, <br />we do not find where these culverts were included in the cost estimate, so a credit for <br />the removal would not be appropriate. Please remove the request for credit for <br />demolition of the unnamed culvert and Culvert C -F4. <br />c. BRL is requesting a credit for removal of Culvert C -G2, listed as an 18" diameter <br />culvert, 46' long. Task 165 of the currently approved reclamation cost estimate lists <br />this culvert as 12" diameter and 40' long; this diameter is consistent with the currently <br />approved page Exh 8 -31. Please revise the request for credit for demolition of Culvert <br />C -G2 to be consistent with the dimensions in currently approved reclamation Task <br />165. <br />d. BRL includes costs for removing a 4' x 4' concrete box structure at the outlet of <br />Culvert C -G5. Please provide additional information on the dimensions of the <br />structure, including the thickness of the concrete, and the number of <br />faces /sides on the structure. <br />BRL: Adequacy comments a -d have been addressed. A new reclamation estimate <br />is attached. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />The following revised permit pages and maps are enclosed. <br />Volume I Page 2.05 -40 <br />Reclamation Estimate <br />Map for review purposes of proposed pond D expansion <br />