Laserfiche WebLink
0 2.05.4(2)(e) <br />r� <br />8. The remainder of the borehole will) be filled to the surface with soil. <br />9. The borehole location will be marked. <br />10. A well abandonment report will be submitted to the DMG that includes <br />all of the items required in Rule 4.07.3. The report should include the <br />theoretical and actual volume of cement used. <br />PR -12 2.05-82 02/10 <br />it PPi2oV6� <br />11116110 <br />