My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-18_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-06-18_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:52 PM
Creation date
6/25/2014 12:48:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/18/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Ol <br />• <br />2.05.4(2)(e) <br />2.05.4(2)(e) Revegetation Plan <br />PR -12 <br />� PPRa u6b <br />)1116 110 <br />Schedule of Revegetation <br />The schedule of revegetation for the majority of the disturbed areas is not <br />possible to predict. When the mine is no longer an economically viable <br />operation, it will be reclaimed and revegetated. The time frame for the <br />revegetation could vary from as little as five years to more than fifty years. <br />Topsoil stockpiles, cut slopes and other disturbed surfaces associated with the <br />mine construction will be revegetated during the first available planting season <br />typically September 1 st to November 15th. <br />Seed Mix <br />The revegetation objective for the disturbed area is to achieve a diverse, self - <br />sustaining cover of the grasses, forbs, and shrubs that will become a <br />productive and stable vegetative community. The number of shrubs replaced <br />per acre will be considerably less than the density of shrubs present on the <br />proposed disturbed area. Since the intent of the revegetation plan is to <br />establish a rangeland and wildlife land use that is equal to or better than the <br />existing conditions, fewer shrubs will be replaced so as to balance the grass <br />forage production against the shrub cover needs of wildlife. <br />The grass forage needs of wildlife in the permit and surrounding area is an <br />important concern. The surrounding area is dominated by oak brush and <br />Juniper trees. Very little area is open grassland, though small meadow <br />enclosures within a mixed shrub matrix can be found as a natural part of the <br />landscape at higher altitudes north of the disturbed area. The primary mine <br />disturbance will be about 4,000 feet long in a north -south direction and will <br />range from a few hundred to 1,000 feet wide. The reclamation of the mine will <br />add 40 to 50 acres of grass dominated forage to the overall area which should <br />improve the wildlife habitat. <br />Eight seed mixes will be used for the revegetation work, one for temporary soil <br />stabilization and seven for final reclamation purposes. The permanent mixes <br />include a set of core species which will be used and a set of optional species <br />which may be used depending on their availability and price at the time of <br />actual reclamation. Varieties are listed to assist the operator but may change <br />based on the recommendations of the seed company at the time of purchase. <br />Varieties_ that are best_ adapted. to mine area will be selected. Seeding rates <br />that are listed are drill seed rates which will be doubled for areas that must be <br />broadcast seeded. <br />2.05-68 02110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.