My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-25_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-06-25_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:02 PM
Creation date
6/25/2014 12:21:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/25/2014
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
MR153
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary for Culvert C13 Extension <br />Permit Action: Minor Revision <br />Site: Bowie No. 2 Mine 153 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 6/25/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -00o <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />111 <br />366 <br />Credit for previous Task 111 amount <br />NA <br />1 <br />1 <br />1 <br />44.21 <br />($25,971.43) <br />$26,854.00 <br />$335.98 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout /Coal Stkpl <br />SCRAPERI <br />45.71 <br />Remove Culvert C13 Extension <br />DEMOLISH <br />80.00 <br />SUBTOTALS: <br />81.5 <br />$1,219 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$24.62 <br />$12.80 <br />$0.00 <br />$121.90 <br />$159.32 <br />$1,378.32 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contractibid preparation: <br />4.00% <br />Total = <br />$55.13 <br />Reclamation management and /or administration: <br />3.13% <br />$43.14 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$257.59 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,476.59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.