Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: _ 0.800 (SSD-AC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.902 ( (CAT HB) <br /> Blade type: 1.000 —� — (PAT) <br /> J Net correction: 0.4508 <br /> Adjusted unit production: 285.94 LCY/hr <br /> Adjusted fleet production: 285.94 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.753/LCY <br /> Total job time: 67.16 Hours <br /> Total job cost: $14,457 <br /> CIRCES Cost Estimating Software <br />