Laserfiche WebLink
BULLDOZER RIPPING WORK <br /> T k description: Rip compaction in disturbed area <br /> Site: Bayfield Pit No. 1 Permit Action: 2014 Inspection Permit/Job#: M1987038 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: �6/24/2014 County: La Plata Filename: _M038-002 _ <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Riper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> I Utilization% <br /> Ownership Cost/Hour: $69.05 NA <br /> Operating Cost/Hour: $108.22 100 T <br /> Ripper Operating Cost/Hour: $7.46 100 _ <br /> Operator Cost/Hour: $38.01 _�_ NA <br /> Total Unit Cost/Hour: $222.73 <br /> Total Fleet Cost/Hour: $222.73 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Al'emate <br /> Methods: <br /> Seismic: A Bank Volume: NA BCY NA <br /> Area: 3.00 acres Rip Depth(ft): 1.00 Volume: 20,973 BCY or CCY <br /> Source of estimated quantity: <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: _ NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 mph <br /> Average Ripping Width: 7.08 degrees <br /> Average Ripping Length: 500.00 feet <br /> Average Dozer Speed: 88.00 feet <br /> Average Maneuver Time: 0.25 feet <br /> Production per unit area: 0.822 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.822 Acres/hr <br /> Site Altitude: 6,500 _ feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.68 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.68 Acres/hr <br /> J�E AND COST <br /> Fleet size: 1 Grader(s) Total job time: 19.05 Hours <br /> Unit cost: $326.454 Per acre Total job cost: $4,244 <br /> CIRCES Cost Estimating Software <br />