Laserfiche WebLink
COST SUMMARY WORK <br /> Task description. 2014 Inspection <br /> Site: IBayfield Pit No. 1 Permit Action: 2014 Inspection Permit/Job#: M1987038 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 _ State: Colorado _ Abbreviation: None <br /> VDat : 6/24/2014 County: La Plata Filename: M038-000 <br /> der: KAP _� --- <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet ( Task <br /> Task Description Used Size j Hours Cost <br /> 001 Reduce hi hwalls to 3:1 DOZER 1 — -�4—.59- $989.00 <br /> 002 Rip compaction in disturbed area RIPPER 1 19.05 1 $4,244.00 <br /> 003 Replace Topsoil on Disturbed Areas DOZER 1 67.16 $14,457.00 <br /> 004 Reve etation REVEGE 1 15.00 S16,888.00 <br /> 005 Mobilize/Demobilize MOBILIZE 1 4.22 $1,206.00 <br /> SUBTOTALS: 110.02 $37,784 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 0.00% Total= $0.00 <br /> Performance bond: 0.00% Total= _$0.00 <br /> Job superintendent: 55.01 hrs Total= _$4,134.55 <br /> Profit: 10.00% Total= $3,778.40 <br /> TOTAL O&P= $7,912.95 <br /> CONTRACT AMOUNT(direct+O&P)= $45,696.95 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 7.10% $3,244.48 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $11,657.43 <br /> TOTAL BOND AMOUNT(direct+indirect)= $49,441.43 <br />