My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:36:02 AM
Creation date
6/24/2014 2:20:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/24/2014
Doc Name
Weekly CQA Report: Week ending 06/14/14.
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. . ................. <br /> amee�- <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; production drilling and <br /> blasting: SLF moisture content and density testing; sampling and testing of drain cover fill (DCF)for <br /> QC, and sampling and testing of SLF material for QA and QC, subgrade certification in the PSSA; <br /> and SLF inspection and certification. <br /> 11) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br /> Atterberg limits, moisture-density relationships, gradations, material classification, and field material <br /> sampling were performed during this reporting period. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Drain Cover Fill sample number DCF-87, DCF-88 and DCF-89 (control samples). <br /> Soil Liner Fill sample numbers SLF 3-R, 4-R, 5-R, 6-R, 7-R, 8-R and 9-R(record samples). <br /> General Project Items <br /> Meetings and Discussions: Weekly Contractor Meeting—June 11, 2014(CC&V,AMEC, Ames); <br /> CC&V Weekly Safety Professional Meeting—June 12, 2014; ECA daily safety meetings, and Ames daily <br /> safety meetings. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, <br /> AMEC, and Ames. <br /> Miscellaneous: <br /> Drain cover fill crusher processing continued <br /> Riprap screen processing continued <br /> Soil liner fill placed at the PSSA was moisture conditioned <br /> Deliveries: None <br /> Submitted by: % ' Date: June 17, 2014 <br /> Bobby Redd B - <br /> Reviewed by: ""`_- ? _`' Date: June 17, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Approved By: Date. A`T 4- <br /> Approved By: �C� Date: - <br /> 2014 06.14-mle2 weekly draft Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.