2014-06-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:36:02 AM
Creation date
6/24/2014 2:20:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/24/2014
Doc Name
Weekly CQA Report: Week ending 06/14/14.
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec - <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek &Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: June 14, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor. Ames Construction, Inc. <br /> Reporting Period: 06.08.2014 through 06.14.2014 <br /> Days S M T 1 W T F S <br /> Work Shifts <br /> D=Day Shift N=Night Shift W=Weather day <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 55°F to 72°F Cloud Cover: Partly cloudy <br /> Lows: 30°F to 45°F Precipitation: Afternoon rain Wednesday <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF (PSSA) <br /> Topsoil/Overburden Stripping: No topsoil or overburden stripping took place during this <br /> reporting period. <br /> Tree Grubbing and Clearing, Chipping: <br /> Clearing and grubbing was performed downslope of Phase 2 Diversion Channel alignment east of <br /> the Phase 2 Pond. Seed Masters chipped trees on top of the Area 34 stockpile. <br /> Production Drilling: Production drilling was performed within the VLF limits. <br /> Production Blasting: One production blast occurred within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the technical <br /> specifications. <br /> Material was loaded in Cat 740 and 777 haul trucks from various places on the PSSA floor at the <br /> toe of the slopes; a John Deere 850 excavator loaded Cat 740 haul trucks with processed reject <br /> material from the clay plant; and a Cat 980 loader placed undersized rip rap screen reject <br /> material from the riprap plant in Cat 740 haul trucks. All material from these areas were <br /> 2014.06.14-mle2 weekly final Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.