My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-24_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2014-06-24_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:34:57 AM
Creation date
6/24/2014 2:20:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
6/24/2014
Doc Name
Second Adequacy Review
From
Climax
To
DRMS
Type & Sequence
TR23
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTIONSIX Menitenng end Inspeelse <br /> Table 6-1 <br /> Summary of Monitoring and Inspection <br /> Area to Be InspectedlMonkored Inspection I Monitoring Minimum Frequency <br /> General observations Daily <br /> Tailing Delivery Line Detailed visual inspection by walking line Bi-annually <br /> — ----------------------------------------------- <br /> Video buried sections Every 5 years <br /> General observations Daily <br /> East Tailing Delivery Line <br /> Detailed walking inspection by walking line Bi-annually <br /> Drop Structures General observations Daily <br /> Detailed inspection Bi-annually <br /> Cutouts Visual inspection Monthly or when in use daily <br /> Automated Cutout Valve Visual inspection Daily <br /> General observations Daily <br /> Cyclone System Pressure gage manual reading Daily <br /> Detailed inspection Bi-annually <br /> Visual inspection Twice per day <br /> Header Line and Spigots Line pressure gage manual readings Daily <br /> Line pressure gage automated readings Data reported nearly continuous <br /> Leadoffs Visual inspection Twice per day <br /> Tailing Dam(beach,crest,and downstream slope) Visual monitoring(Daily Checklist) Daily <br /> Monitor beach width Daily <br /> Dam Beach Elevation-fill stake readings or point survey As needed based on chang ing conditions <br /> Survey Bi-annually <br /> ------ ------ -- <br /> Profile sampling Initially annually but may reduce based on observations <br /> 14 Piezometers automated(dam face) Data collected twice per day and evaluated weekly <br /> --- --------------_-----------------------------Dam Embankment -1 Inclinometer manual reading(dam face center) Bi-annually <br /> 7 movement monuments-survey(dam face) Annually <br /> Pressure transducer automated(barge mount) Data reported nearly continuous and evaluated daily <br /> Decant Pond Levels Visual monitoring Daily <br /> Bathymetric survey Bi-annually <br /> Surface Water Interceptor System Visual inspection Weekly during Spring runoff(typically May-June) <br /> West Interceptor Parshall flume(automated) Data recorded hourly and evaluated periodically <br /> Montana flumes(automated) Data recorded hourly and evaluated periodically;Flows periodically <br /> Subdrain System visually monitored for changes in clarity <br /> Remote video inspection Every 5 years <br /> C� RW�te. MFP_ 6-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.