My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-23_REPORT - P2011002
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2011002
>
2014-06-23_REPORT - P2011002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:26:20 AM
Creation date
6/24/2014 6:52:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011002
IBM Index Class Name
Report
Doc Date
6/23/2014
From
Colorado Mining Enterprises, LLC
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Fee/Report
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/-�-r 1J- JUIV 2 3 <br /> Page��� <br /> MP Annual Report DIV�S�� �014 <br /> NpcPE <br /> Permittee Name: Colorado Mining Enterprises. LLC Permit Number: P-2011-002 v k JAIVDS # <br /> Operation Name: CME Mineral Prospecting Project County: Mineral <br /> Annual Fee Due: $86.00 Anniversary Date: July 15,2014 <br /> Permit Acreage: 2.90 Current Bond Amt: $6,377.00 <br /> According to Colorado Statute, each year, on the anniversary date of the permit, an operator shall submit the Annual Fee, <br /> an Annual Report and Map showing the extent of current disturbances to affected land,required monitoring information, <br /> reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br /> the upcoming year, any reclamation that will be performed during the upcoming year,the dates for the beginning of active <br /> operations, and the date active operations ceased for the year. <br /> Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br /> compliance inspection of the site. If,while completing this report,you learn that your site is not in compliance with the <br /> rules and the act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the affected area boundary clearly marked if you have an excavation or portal? YE NO <br /> 2. Is the site in final reclamation? YE <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 3. What was the date of last exploration activity? C <br /> 4. What date did prospecting activity end, or what date is it expected to end?Rule 5.6.1(e). Ic i <br /> 5. Number of acres currently affected(exploration+incomplete reclamation). Q <br /> 6. Number of acres that were newly affected during the current report year. G <br /> 7. Number of acres that were reclaimed during the current report year. RECEIVED <br /> 8. Estimated new acreage to be affected in the next report year. JUN 2 3 2014 <br /> 9. Estimated acres to be reclaimed in the next report year. Division of Reclamation, a v Q <br /> Mining&Safety <br /> 10. Total acres in various stages of reclamation, since permitted exploration activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfired: 1_6 seeded w/ 1,6 w/topsoil I. mulched w/ a <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: (-Q fertilized w/ 16 replacement d rate(tons/ac): G <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application 5 � application s � application r <br /> method: r method: method: N I <br /> 11. Is weed control being conducted in accordance with an approved Weed Control Plan? <0 NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 12. Is ade uate topsoil reserved for reclamation,based on your approved NOI? NO N/A <br /> If"N ",please explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.