Laserfiche WebLink
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They <br />are GVB -B11A, B11 B, B12A, B12B, B12C & B13A. MR -124 approved two <br />additional holes to be drilled in 2011. They are GVB -B11 C and B12D. <br />GVB -B12A, B12B, B12C & B13A were drilled in 2012. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. <br />They are GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB -B13E, <br />GVB -B14A, GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. GVB -B1 2E, GVB -B1 3B, GVB -B1 3C, GVB- B13D,GVB- <br />B13E, GVB -B14A, SS -7 and 2012 -1 were drilled in 2012. The remaining <br />holes were drilled in 2013. <br />Bowie -2 MR -133 approved the 2012 installation of four utility holes to be <br />installed north of the large ventilation fan above the D -Seam portals. MR- <br />133 also approved the 2012 installation of GVB -13F. <br />Bowie -2 MR -134 approved the installation of an emergency vent hole into <br />the B13 tailgate bleeder entry. Due to technical difficulties this vent hole <br />was not installed. The drill pad for the emergency hole was constructed. <br />Bowie -2 MR -135 approved the 2013 installation of an emergency gob vent <br />hole for the B13 panel (GVB- B1 3C -1). <br />Bowie -2 TR -78 approved the 2013 installation of six gob vent holes and <br />one exploration hole. They are GVB -B14F, GVB -B15A and exploration <br />hole SS -8. GVB -B15B, GVB -B15C, GVB -B15D, GVB -B16A will be drilled <br />in 2014. <br />Bowie -2 MR -146 approved the installation of 4,300 feet of 6 inch diameter <br />schedule 80 HDPE pipe adjacent to the existing Pitkin Mesa pipeline. The <br />new pipeline will be located over longwall panels B -15 and B -16. <br />Bowie -2 TR -86 approved the 2014 installation of ten gob vent holes and <br />three exploration holes. They are GVB -B16B, GVB -B16C, GVB -B16D, <br />GVB -B17A, GVB -B17B, GVB -B17C, GVB -B17D, GVB -B17E, GVB -B19A, <br />GVB -B1 9B and exploration holes 2014 -SS -A, 2014 -SS -B and 2014 -SS -C. <br />Bowie -2 MR -152 approved moving eleven gob vent holes. The 15, 16, 17, <br />18 and 19 series holes were moved. <br />MR -152 2.05-49- 06/18/14 <br />