Laserfiche WebLink
03-29-95 08: 1,1 AM _ TO 303 832 8106 P08 <br /> "EXHIBIT D" - (con't) <br /> RECLAMATION PLAN <br /> Using this plan will make the reclaimed land of subject site <br /> superior to that of neighboring lands. <br /> Execution of this reclamation plan is estimated to be <br /> $3,500.00. Most of the cost will be in the grading and preparation <br /> for re-vegetation. Materials necessary for accomplishment are on <br /> site and little dry surface area will be affected. Operator will <br /> keep the banks of the bond at not steeper than a 3:1 ratio during <br /> mining operations. This will minimize need for much work on banks <br /> of pond at time of reclamation. <br /> This Reclamation Plan will be completed 120 days after <br /> termination of mining operations at the Thomeczek Pit. <br /> -2 <br />