Laserfiche WebLink
Blue Pit <br />Topsoil of the graded side slopes: <br />79.9 acres @ 12 inches = 128,905 yd3 <br />@ $1.50 per yd3 ___ <br />Rip the pit floor and compacted areas: <br />20.1 acres @ $200 per acre <br />Place topsoil on pit floor: <br />20.1 acres @ 12 inches = 32,428 yd3 <br />@_V. 10 per yd3 <br />Disc topsoil areas prior to seeding: <br />50.84 acres @ $100 per acre <br />Seed, mulch and fertilize all disturbed areas: <br />Drill seeding and crimp mulching will be employed <br />50.84 acres @ $950 /acre <br />Install catch benches and ditches: <br />35,399 feet @ $1 / foot <br />Install grouted channels: <br />3,416.91 @ $6 / foot <br />Install Energy Dissipation Rock <br />Totals <br />DRMS Costs (28% x direct costs) <br />Total Bond Amount <br />112 Permit Amendment <br />3 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />18 <br />$ 193,358 <br />$ 4,020 <br />$ 35,671 <br />$ 5,084 <br />$ 48,298 <br />$ 35,399 <br />$ 20,501 <br />$6,000 <br />$ 1,765,955 <br />$ 494,467 <br />$ 2,260,422 <br />Western Slope Aggregates, Inc. requests that DRMS use a 5 -year increment bond since the fill <br />import material will not be brought in all at once but spread out over the life of the mine. <br />Blue Pit May 2014 L -3 <br />