Laserfiche WebLink
12. Pr mau future Post -minin land use check one): <br />Cropland(CR) Pastureland(PL) <br />�✓ Rangeland(RL) F'] Forestry(FR) <br />Residential(RS) E Recreation(RC) <br />Developed Water Resources(WR) <br />13. <br />Cropland(CR) <br />Rangeland(RL) <br />Pastureland(PL) <br />Forestry(FR) <br />Residential(RS) " Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />surface excavation of topsoil, overburden and gravel using dozers, loaders, trucks <br />15. On Site Processing: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): mining by dozers, loaders, trucks <br />Crushing, screening, asphalt and concrete plants (concrete plant operated by Casey Concrete) <br />t any designated chemicals or acid - producing materials to be used or stored within permit area: <br />sl, oil, and other chemicals associated with the processing plants <br />16. Deicriation of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The existing permit area is 82.70 acres; approximately 25 acres is still able to be mined. This <br />amendment application is to allow for an expansion area of approximately 60 acres, all of which <br />will be used for additional gravel mining. The existing reserves will be exhausted in <br />approximately 7 to 9 years and Western Slope Aggregates, Inc. wants to secure reserves further <br />into the future. The expansion area is located directly adjacent to the existing operation. <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />surface excavation of topsoil, overburden and gravel using dozers, loaders, trucks <br />15. On Site Processing: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): mining by dozers, loaders, trucks <br />Crushing, screening, asphalt and concrete plants (concrete plant operated by Casey Concrete) <br />t any designated chemicals or acid - producing materials to be used or stored within permit area: <br />sl, oil, and other chemicals associated with the processing plants <br />16. Deicriation of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The existing permit area is 82.70 acres; approximately 25 acres is still able to be mined. This <br />amendment application is to allow for an expansion area of approximately 60 acres, all of which <br />will be used for additional gravel mining. The existing reserves will be exhausted in <br />approximately 7 to 9 years and Western Slope Aggregates, Inc. wants to secure reserves further <br />into the future. The expansion area is located directly adjacent to the existing operation. <br />