My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-20_REVISION - M1981207 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981207
>
2014-06-20_REVISION - M1981207 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:14 PM
Creation date
6/20/2014 4:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
REVISION
Doc Date
6/20/2014
Doc Name
Application AM01
From
Western Slope Aggregates, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
SJM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blue Pit <br />112 Permit Amendment <br />• Portable Screen Decks <br />• Portable Stacking/ Transporting Conveyors <br />• Water Truck for dust suppression <br />• Portable Generators for plants <br />• Electric Control Van <br />• Wheel Loader Cat 988, Cat 980 <br />• Cat D -9 size dozer or equivalent <br />• Portable Wash Plant <br />• Portable Concrete Plant and Mixer Trucks to take material off -site <br />• Raw Material Trucks to haul raw gravel from crusher to facilities area <br />Portable Asphalt Plant and Highway Haul Trucks <br />Support equipment will to come to the site on an as- needed basis. The facilities area will house the <br />mine office, the shop, parts storage and a truck scale. The employee and vendor parking area will <br />also be located here. <br />There will be no blasting as part of this operation. <br />No refuse, acid or toxic producing material are expected to be encountered in this operation. If <br />these material are encountered, topsoil will be placed over the area and mining will move to a <br />different area. <br />Any new fencing will be installed according to the Division of Parks and Wildlife's specifications. <br />The operator commits to clearly marking the affected area boundary with stakes surveyed on site, <br />once the permit is approved. It is planned that the material may be used to provide base material <br />for construction projects in the area. <br />One main road will be present in the mining area and will change locations in the pit as mining <br />progresses. In pit roads are not delineated as they will move throughout mining. <br />Access Road <br />The site will continue to use the same haul route to Highway 82, which is a private road and is <br />shown on Map C -2A and Map C -213. The daily or hourly haul traffic is not increasing with the <br />expansion of the reserves. There is an additional haul route when servicing the area to the north of <br />the pit which only produces a very small amount of tonnage per year. This haul route uses CR 103 <br />and CR 104 to access Crystal Creek Road and is shown on Map C -2. <br />Water Handling <br />Water for this site is supplied from the Basin Ditch, Spring Ditch and a well on site. The mining <br />operation has an approved augmentation plan for the use of the water from the Basin Ditch which <br />is located in Appendix A. The water is used for dust suppression, material washing and concrete <br />production. One of the challenges that Western Slope Aggregates faces at this site is mining the <br />reserves under the Basin Ditch. Recovering these resources needs to happen in a way that will not <br />Blue Pit May 2014 D -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.