My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-18_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-06-18_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:53 PM
Creation date
6/19/2014 8:40:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/18/2014
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources, Jim Stover
Type & Sequence
TR90
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclamation Costs for GVB- B17F /B19C <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Task #: OON State <br />Date: 6/18/2014 County <br />User: SLB <br />Permit Action: Technical <br />Revision 90 <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -00n <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />OOm <br />343 <br />362 <br />363 <br />364 <br />365 <br />Credit for previous sealing Task 343 <br />NA <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.00 <br />($78,178.00) <br />$78,562.40 <br />$19,620.22 <br />$8,957.00 <br />$3,802.00 <br />$4,731.00 <br />Increase Depth of GVB -B15A <br />BOREHOLE <br />0.00 <br />Seal GVB -B17F and B-1 9C <br />BOREHOLE <br />24.00 <br />Regrade GVB /exploration hole pads and roads <br />DOZER <br />35.30 <br />Re- topsoil 10 GVB, 3 Exploration holes pads <br />DOZER <br />14.99 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />17.00 <br />SUBTOTALS: <br />91.29 <br />$37,494 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$757.38 <br />$393.69 <br />$0.00 <br />$3,749.40 <br />$4,900.47 <br />$42,394.47 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />$1,695.78 <br />Reclamation management and /or administration: <br />3.13% <br />$1,326.95 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$7,923.20 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$45,417.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.