Laserfiche WebLink
T. Bird, GCC Energy, LLC <br />C -1981 -035 / TR -22 / AdegReview <br />18 run 2014 <br />Page 3 of 3 <br />2.05.4 — Reclamation Plan <br />b. As observed in Item 2, above, there has been no discussion of whether water may be <br />encountered in any of the proposed drill holes. Please revise this section to address any <br />modifications to the sealing plan that would be enacted if water- bearing intervals are <br />encountered during the drilling process. <br />7. A new subsection, "Sealing Exploration Drill Holes ", has been added to 2.05.4 beginning <br />on Page 18. As discussed in Item 4, above, there are inconsistencies between the <br />proposed text and the detail provided in Appendix 4(4). Please revise, as appropriate. <br />8. Revegetation of the drill pads has not been addressed. Please revise the "Sealing <br />Exploration Drill Holes" subsection to include a discussion on reseeding efforts to be <br />utilized, and refer the reader to the Revegetation subsection of the permit. <br />This concludes the Division's Adequacy Review for TR -22. Please contact me with any <br />questions you may have. <br />Best regards, <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />Enclosure — (2) <br />Cc: Sandy Brown, DRMS <br />