Laserfiche WebLink
size. Surface disturbance, and reclamation requirements and costs calculated by PSCM are <br />summarized on Table 2, 2012 Exploration Reclamation Cost Estimate. <br />TABLE 3 <br />PEABODY SAGE CREEK 2012 EXPLORATION PROGRAM <br />2012 DRILL HOLE SPECIFICATIONS <br />Hole ID <br />Collar Elevation <br />Est. Depth to Wadge <br />Est. Total Depth <br />CCU031 <br />6,795 <br />1,450 <br />1,750 <br />CCU047 <br />6,622 <br />1,500 <br />1,800 <br />CCU058 <br />6,744 <br />1,650 <br />1,950 <br />CCU067 <br />1 6,835 <br />1,400 <br />1,700 <br />CCU 084 <br />6,900 <br />1,450 <br />1,750 <br />CCU085 <br />6,920 <br />1,150 <br />1 1,450 <br />Peabody Sage Creek Project 7 April 2012 <br />