Laserfiche WebLink
RULE 2 - PERMITS <br />Table 2.05.3 -T2: <br />Labor Force Schedule <br />Year <br />1 2 3 <br />4 <br />5 <br />flourly <br />0 50 121 <br />150 <br />150 <br />Satarled <br />6 25 35 <br />45 <br />45 <br />Total <br />6 75 156 <br />195 <br />195 <br />Mining Equipment - The PSCM will use conventional mining methods and equipment similar to <br />that used in active underground coal mining operations in the Western United States. A typical <br />continuous miner section will consist of the following equipment: <br />• Continuous Miner(s) <br />• Shuttle Cars <br />• Roof - Bolter <br />• Feeder - Breaker <br />• Electrical Load Center <br />• Mantrip Vehicle(s) <br />• LHD Scoop(s) <br />• Parts Car <br />• Mobile Tail Piece <br />• Rock Duster <br />• Face Fans <br />• Miscellaneous Pumps and Tools <br />The following types of utility and support equipment (both underground and surface) may also be <br />utilized for the PSCM: <br />• Mine Ventilation System <br />• Electrical Distribution System <br />• Production Water Supply System <br />• Conveyor Systems <br />• Rockdust Distribution System <br />• Mine Communications System <br />• Mine Monitoring Systems <br />• Personnel First Aid and Safety Equipment <br />• Personnel Carriers <br />• Supply Tractors and Trailers <br />• Lubrication Trailers <br />• Maintenance Equipment and Supplies <br />• Front End Loaders <br />• Haulage Trucks <br />• Dozers <br />• Motor Grader <br />• Water Truck <br />TR -01 -10 2.05 -9 Revision 02 /11 <br />