Laserfiche WebLink
Staging, construction of a temporary road and a portion of the drainage repair will take place within <br />the existing PSCM permit boundary in an area just east of the warehouse in the NE portion of the <br />SW '/4 SE '/a of Section 27, T6NR87W. An area known as the " Boneyard" (refer to Facilities Map <br />(North End) Map 2.05.3 M 1 B) will be used to stage equipment. Access to the eroded gully to the <br />east from the boneyard area will require a temporary road to be constructed. Both the boneyard and <br />a portion of the temporary road, as well as the pond and a small portion of the damaged channel are <br />within the permit boundary and create the potential for sediment runoff to PSCM's permitted Small <br />Area Exemptions (SAE's). <br />Best Management Practices (BMP's) will be implemented to contain any sediment generated during <br />earth moving and revegetation activities. Erosion control BMP's to be implemented include <br />placement of silt fence or wattles along excavated areas and at the toe of slopes being disturbed by <br />construction activities. Two temporary culverts will be installed to route drainage underneath the <br />temporary road that will be removed as part of the access road reclamation. All disturbed areas <br />within the existing permit boundary will be restored to existing conditions including seeding with <br />the approved seed mix as specified in the mining permit. The AML group will also monitor the site <br />to ensure slope stability, revegetation success, and to control noxious weeds in following years until <br />the site is fully reclaimed. <br />MR 25 -14 2.05 -33.1 Revision 06/2014 <br />