Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />10= J: I WS] 0 a. 7_ rre7. 7_ ��I0 JIMal4 LTA I161aII Eel WIIINON IIaIN011 NINI no] a01001aK RIN <br />Cessation <br />CV- 2014 -001 <br />Notice of <br />CV- 2014 -001 <br />Order No. <br />Violation No. <br />Date NOV or <br />April 30, 2014 <br />Permit No.: <br />C- 1981 -025 <br />CO Issued: <br />Mine: <br />North Thompson Creek Mine <br />County: <br />Garfield <br />Operator (If <br />MINREC, Inc. <br />Type of Mine: <br />Underground <br />Other than <br />Permittee): <br />Mail Address: <br />2352 N 7th St, Ste B <br />Permittee: <br />MINREC, Inc. <br />Grand Junction, CO 81501 -8168 <br />Mail Address: <br />2352 N 7th St, Ste B <br />Grand Junction, CO 81501- <br />8168 <br />In Violation CV- 2014 -001, the deadline for abatement of the practice, condition or violation described <br />was fixed as described below. It is hereby found that the operator has failed to abate such practice, <br />condition or violation, or cannot complete abatement within the time allowed, but that such failure is <br />not due to lack of diligence on the part of the operator. The time for abatement is therefore extended <br />as follows: <br />Abatement Description Original Date Extended <br />Step Due Due Date <br />2 Re- construct the spillways for Pond P9 to ensure the June 20, 2014 July 29, 2014 <br />primary and emergency spillways are in compliance with <br />the approved revision and Rules 4.05.6(4) and 4.05.9(2). <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: June /177, 2014 <br />By:u- --�`�' <br />(Signature of Authorized Representative) <br />Brock F. Bowles <br />Environmental Protection Specialist <br />[Signature of Division Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Division's justification for <br />approving the extension beyond 90 days is attached. <br />