Laserfiche WebLink
Row explanations- <br /> 1 Average monthly diversions(1980-2012)by Fort Sent Ditch.Excludes Project water. <br /> 2 Proration of diversions for 386 shares out of 11.651 2 shares outstanding.Row 1 x(386/11651.2) <br /> 3 Proration of diversions for 923 shares out of 11,651.2 shares outstanding.Row 1 x(923/11651.2) <br /> 4 Proration of diversions for 1,890.6 shares out of 11,651.2 shares outstanding.Row 1 x(1890.6111651.2) <br /> 5 Row 2+Row 3+Row 4. <br /> 6 Historical return now obligations on 923 shares(Case No.02CW181)and 1890.6 shares(Case No 05CW107-A pending)after deduction for ditch loss: <br /> April-July:Row 3 x 0.881 x 3121923+Row 4 x 0.881 x 431.6/1890.6 <br /> August:Row 3 x 0.881 x 312/923+Row 4 x 0.881 x 495.611890.6 <br /> September.Row 3 x 0.881 x 3121923+Row 4 x 0.881 x 697.6/1890.6 <br /> October:Row 3 x 0.881 x 312/923+Row 4 x 0.881 x 962 6/1890.6 <br /> November-March:(Row 3+Row 4)X0.881 where ditch kiss=11 9%(HI model factor)and 1-0 119=0.881 <br /> 7 Projection of amounts pumped from Fort Bent Ditch to bap fields(5.9 acres). <br /> 8 Project water delivered below John Martin Dam for the Fort Bent Ditch. <br /> 9 Transit loss from John Martin Reservoir to Fort Sent Ditch is estimated to be 5%of the amount released Row 8 x 0 05 <br /> 10 (Row 8-Row 9)x 0.119. <br /> 11 Row 2 x(1-0.119) <br /> 12 (Row 3+Row 4)x(1-0119)-Row 6-Raw 7. <br /> 13 Row 8-Row 9-Row 10. <br /> 14 (Row 11+Row 12+Row 13)x(1-0.08).The evaporation loss on the recharge site was estimated to average 8%of the delivery <br /> 15 Projected UU pumping inclusive of Rows 16,17,18&19. <br /> 16 Lasser of Row 11 x(1-0.08)or Row 15. <br /> 17 Projected pumping by pre-1986 wells under Rule 14 Plan. <br /> 18 Projected pumping by Well No.47 per substitute water supply plan <br /> 19 Projected pumping by floating pump for irrigation of golf course and Fairmount Cemetery(51.2 acres)per substitute supply plan. <br /> 20 Row 14-Row 15.Negative(-)values indicate that pumping was greater than recharge and postbve values indicate that recharge was greater than pumping. <br /> 21 Projected pumping by Golf Course Well No 31 Backup per substitute supply plan. <br /> 22 Projected delivery to Fairmount Cemetery. <br /> 23 Projected delivery to Golf Course. <br /> 24 Projected pumping by Well No.31,ID No.6705388.a pre-1985 Dakota/Cheyenne bedrock aquifer well. <br /> 25 Row 20 amounts logged to Arkansas River and combined with lagged amounts from previous years.SDF=5825 days. <br /> 26 Depletions caused by previous years'pumping of structures that are now Included in LAWMA's plan for augmentation Case No.02CW181. <br /> 27 Row 21 amounts lagged to Arkansas River and combined with lagged amounts from previous years.Cheyenne aquifer and Glover parameters <br /> 28 Row 25+Row 26+Row 27. <br /> 29 For the April-November,and March Periods-Minimum of 1)Row 15,or 2)average of Row 15 winter months(December 2013-February 2014). For the December-February period:Row 15. <br /> 30 Row 15-Row 29. <br /> 31 Row 29 x(Row 17+Row 18)/Row 15.(Rule 14&Well 47 proportionate In-Building use.) <br /> 32 Row 31 x 86/3.487.(86 of 3,487 customer accounts are non-severed(i.e.,septic systems).) <br /> 33 Row 17+Row 18-Row 31 <br /> 34 90%x Row 32+13%x Row 33. (2%of irrigation use becomes surface runoff in the same month of application.) <br /> 35 Row 34 amounts lagged to Arkansas River and combined with lagged amounts from previous years,plus 2%or Row 33(surface runoff from lawn irrigation).SDF=429 days. <br /> 36 (Row 21+Row 22+Row 23-Row 24)x 15% <br /> 37 Row 36 is distributed to got course and to cemetery based on deliveries to each.Return flows from got course occur in same month as delivery <br /> Cemetery return flow amounts are lagged to Willow Creek.Willow Creek Aquifer and Glover parameters. <br /> 38 Row 7 x 15%. <br /> 39 Row 38 lagged to Widow Creek.Willow Creek Aquifer and Glover parameters <br /> 40 Projected metered sewage Influent to wastewater treatment lagoons. <br /> 41 Projected metered use of Well ID No 6705272 for non-consumptive coal washing at Lamar Power Plant and discharge to sewer <br /> 42 Minimum of 1)Row 40-Row 41,or 2)95%x(Row 29-Row 32) (Limited to 95%of the net severed In-Budding use) <br /> 43 Evaporation and evapotranspiration from lagoons (63.7 acres water surface and 32.4 acres phreatophytes) <br /> 44 (Row 42+Row 43)x(Row 17+Row 18)/(Row 16+Row 17+Row 18). <br /> 45 Row 9 x 90%. <br /> 46 Row 10 x 90%lagged to Arkansas River and combined with lagged amounts from previous years Lagging based on factors from HI model <br /> 47 Row 45+Row 46. <br /> 48 Row 28+Row 35+Row 37+Row 39+Row 44+Row 47.Negative(-)values indicate depletion to river/Positive values Indicate accretion to river <br /> 49 Accretions utilized for Lamar North Gateway Park Pond Nos.1,2&3 Substitute Supply Plan. <br /> 50 Row 48-Row 49. Negative(-)values indicate depletion to river/Positive values indicate accretion to river <br /> Halton&Williamson,P C W U.1001•LamarWlaelmenh 5-Clay Creek Pumping,Table 9 4124/2014 <br />