Laserfiche WebLink
June 9, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Number of Partial Inspection this Fiscal Year: 18 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 29 of 31 <br />Topsoil remaining to be <br />stripped on northeastern <br />portion of Gob Pile #3. <br />Aat <br />Topsoil Stockpile F <br />Topsoil Stockpile E <br />Number of Partial Inspection this Fiscal Year: 18 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 29 of 31 <br />