My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-17_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2014-06-17_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:50 PM
Creation date
6/17/2014 10:03:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/17/2014
Doc Name
Adequacy Response
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
RN6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />southfield mine • post office box 459 • florence, colorado 81226 • (719) 7846395 <br />June 6, 2014 <br />Mr. Rob Zuber — Reclamation Specialist <br />Division of Reclamation Mining & Safety <br />1313 Sherman Ave — Room 215 <br />RECEIVED <br />JUN 17 2014 <br />Denver, CO 80203 Division of Reclamation, <br />Mining & Safety <br />RE: Adequacy Response — Permit Renewal No.6 (RN -06) <br />Energy Fuels Coal, Inc. (EFCI) Southfield Mine — Permit No. C -81 -014 <br />Dear Rob Zuber: <br />This is in response to your Adequacy Review letter dated March 28, 2014 concerning <br />Permit Renewal No. 6 (RN -06) for the Southfield mine. Previously, a partial response was <br />submitted (5- 30 -14) to the Division intended for preliminary review. This submittal contains all <br />of the responses and respective revised replacement pages addressing items outlined in the <br />Division's Adequacy Review letter of 3 -28 -2014. The format responds to items in the same <br />numerical order as those listed in the Division's 3 -28 -2014 Adequacy Review letter. <br />Concern #1. The Corley Company Well (Well No. 119459) location was corrected on the <br />Southfield Hydrology map, "Map 12 ". EFCI has verbally agreed with The Corley Company as to <br />mitigation of the well, but a formal agreement is pending. Pursuant to a final agreement, the PAP <br />will be updated accordingly. <br />2. As stated, a decision is pending. <br />3. As stated in MT -06 responses, MW -08 and MW -10 are scheduled for sealing/reclamation <br />along with the rest of the listed exploration drill holes that require reclamation. The PAP will be <br />updated accordingly. <br />4. Section 2.03.5 has been updated to include additional and recent infractions. A copy of <br />the Additions Page for insertion to the permit document is included with this submittal. <br />5. Section 2.03.8 has been revised to reflect the term of the permit as from July, 2009 <br />expiring on July 30, 2014 (page 2.03 -39). <br />6. Table 2 (page 2.03 -40) in the permit has been updated to reflect the acreage numbers <br />reported in the current Annual Reclamation Reports (ARR's) on file with the DRMS. Detail of <br />acreages is shown in the ARR's. <br />Attached Revised pgs: 2.03 -40 and 2.05 -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.