Laserfiche WebLink
June 11, 2014 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />Ditch FA -D5 <br />Xf <br />AL <br />Ditch FA -D6 <br />FA- D5 /FA -D6 into FA -D8 <br />Spoil water borehole <br />No portal water was being pumped into FA -D4 at the time of the inspection. <br />The spoil water relief borehole was open with water reporting to the Portal 42 sump. <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance 4.03. 1(5) and <br />(6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />All roads from the North facilities Area to the topsoil pile at the South Facilities Area along with access roads to <br />the area of Pond 004 were accessible and stable at the inspection. No problems were noted, with the exception of <br />the following: <br />- Houndstounge along the the South Facilities roads and road embankments. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The majority of the mine site was previously approved under the Seneca II Mine (C- 1980 -005). These areas, with <br />the exception of the currently approved disturbance boundary have been Phase II released. The reclaimed areas <br />are stable with good vegetation growth and no problems noted. <br />SIGNS AND MARKERS — Rule 4.02: <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 5 <br />Page 4 of 7 <br />