My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-10_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-06-10_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:41 PM
Creation date
6/10/2014 1:21:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/10/2014
Doc Name
Signed Decision Document
From
Bowie Resources, LLC
To
DRMS
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 77 <br />Stipulations <br />34 - Within 45 days of issuance of TR -77, BRL must sumbit a technical revision to address the following <br />for proposed Borrow Areas #1, #2, and #3 at Gob Pile #2: <br />a. A topsoil salvage, storage, and redistribution plan, in accordance with Rules 2.05.3(5), 2.05.4(2)(d) and <br />4.06.4(2); <br />b. A regrading plan in accordance with Rules 4.14.1 and 4.14.2; <br />c. A revegetation plan in accordance with Rule 4.15; <br />d. A sediment control plan in accordance with Rules 2.05.3.(4), 2.05.6(3), 4.05.1, and 4.05.2; <br />e. Revised map(s) in accordance with Rule 2.10.3, clearly indicating the areas proposed for disturbance; <br />f. A reclamation plan and cost estimate in accordance with Rule 2.05.4; and <br />g. A commitment from BRL that materials excavated from any borrow area will be direct hauled for the <br />purpose of covering refuse material, and will not be incorporated into the refuse material, such as for <br />drying purposes. <br />35 - Commencing with issuance of TR -77, BRL must conduct a survey to determine the volume of <br />coverfill material in the stockpiles associated with Gob Piles #1, #2, #3, and #4 on at least a quarterly <br />basis. A report summarizing the survey shall be submitted within 30 days of the survey, and must include <br />a statement of whether the volume of available material is sufficient to meet the requirements of Rule <br />4.10.4(5) and the material balance in the currently approved permit application package. <br />
The URL can be used to link to this page
Your browser does not support the video tag.