My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-09_REVISION - M1979191
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-06-09_REVISION - M1979191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:14 PM
Creation date
6/10/2014 12:14:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
Revision
Doc Date
6/9/2014
Doc Name
Amendment Application
From
Martin Marietta Materials, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Exhibit D - Mining Plan <br /> 4.1 Mining Methods <br /> There is no change in mining methods from the original Three Bells permit M-1979-191. <br /> 4.2 Earthmoving <br /> There is no change in earthmoving procedures from the original Three Bells permit M-1979- <br /> 191. <br /> 4.3 Water Diversions and Impoundments <br /> There is no change in water diversions and impoundments from the original Three Bells <br /> reclamation permit M-1979-191. <br /> 4.4 Size of Work Areas <br /> The size of the largest area in the Ditullio Property to be worked on at one time is Phase 4. <br /> The mine limit encompassing Phase 4 is approximately 69.6 acres. <br /> The other Ditullio Phase mine limit areas are approximately: <br /> • Phase 1: 5.8 acres <br /> • Phase 2: 12.5 acres <br /> • Phase 3: 16.8 acres <br /> • Phase 5: 9.2 acres <br /> The mine limits within the Veldman Property is approximately 81 acres. The ongoing <br /> reclamation currently taking place within the Veldman Property is being conducted in one <br /> phase. <br /> 4.5 Approximate Timetable <br /> Reclamation in the Veldman Property is expected to complete by December 2014, depending <br /> on construction progress, weather delays, etc. Reclamation of the various phases within the <br /> Ditullio Property is expected to occur concurrently with mining operations and be completed <br /> by December 2015, depending on product demand and market conditions. The sequence of <br /> reclamation at the Ditullio Property is expected to occur as follows: <br /> • Phase 5 <br /> • Phase 3 <br /> • Phase 4 <br /> GEI Consultants,Inc. 12 June 2014 <br /> Three Bells Mine Reclamation Permit Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.