Laserfiche WebLink
6 (FORM 1 -All inforrnation for DRMS use and confidential filing) <br /> 3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> NO CHANGE <br /> 4. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> NO CHANGE <br /> 5 Describe how portals,adits, shafts.ponds,excavations,or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> No change to previous approvals. Each of the four new structures will have a concrete <br /> oun a Ion ass own on the design drawings presented In Exhibit A. All equipment, <br /> cancret,_-foundations Will he di ig up, broken into pieces lesr_. than Uva feet in any <br /> dimension and the concrete pieces incorporated into the overall Test Pad recontouring. <br /> 6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> NO CHANGE <br />