Laserfiche WebLink
3 (FORM I -All information for DBMS use and con f dential filing) <br /> C. LOCATION MAP: Attach a USGS 7.5 minute quad,or similar map of adequate scale, which locates the prospecting <br /> site(s). <br /> D. Are prospect sites(e.g.,drill holes,trench locations,etc...)staked on the ground? Yes a No <br /> E. Specify the Land Management Agency,Address and Telephone Number: <br /> F. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br /> not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br /> USFS. Check one: <br /> Evidence of notification is attached to this NOI for BLM Land <br /> Evidence of notification is attached to this NOI for USFS Land. <br /> Other proof of notice is attached to this NOI <br /> II. MAPS & DRAWINGS SEE SITE PLAN IN EXHIBIT A FOR LOCATIONS OF NEW STRUCTURES <br /> Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The <br /> prospector may submit a U.S.G.S. 7.5 minute quadrangle,or similar map of adequate scale that: <br /> 1. Identifies the proposed prospecting site(s)or activity areas involving surface disturbance. Activity areas include all drill <br /> holes,mud pits.excavations,trenches,adits,shafts,tunnels,rock dumps,stockpiles,impoundments and prospecting roads, <br /> and <br /> 2. Includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br /> are not anticipated to be affected. This includes the location of all drill holes,mud pits,excavations,trenches,adits.shafts, <br /> tunnels.rock dumps,stockpiles, impoundments and prospecting roads. Color photographs,adequately labeled(including <br /> date,orientation and location),of the prospecting site may be used to fulfill this requirement if included with the NOI <br /> submittal. <br /> III.PROJECT DESCRIPTION <br /> 1. N. lineral(s)and/or Resource(s)being Investigated: NO CHANGE <br /> 2. Estimated dates of commencement and completion: <br /> Commencement: NO CHANGE <br /> Completion: NO CHANGE <br /> 3. Amount of material to be extracted,moved or proposed to be moved: NO CHANGE <br /> 4. Idanidy the type or met of prospecting pronosed and quantity(place an"X") NO CHANGE <br /> Cuts Pits Trenches <br /> hafts Tunnels Adits El Declines <br /> it Drilling Fluid Drilling Drilling&Blasting <br />