Laserfiche WebLink
6 (FORM 2 -Pithlic filing) <br /> 8. Describe the estimated topsoil depth and how topsoil Nvill be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> NO CHANGE <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> NO CHANGE <br /> 10. Describe how portals,adits,shafts,ponds, excavations,or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> No change to previous approvals. Each of the four new structures will have a concrete <br /> foundation as shown on the design drawings presented in Exhibit A. All equipment, <br /> instrumentation, and structures housed on each foundation will be removed and Me <br /> eenerete foundatiens will be dug up, breken Into pieees less than twe feet in any <br /> dlmensinn and the concrete piecps the overall Test Pad recontoLtrind <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> ISIn CHANGE <br />