My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-10_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2014-06-10_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:31:17 AM
Creation date
6/10/2014 12:14:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Revision
Doc Date
6/10/2014
Doc Name
Form 2 Modification
From
American Shale Oil
To
DRMS
Type & Sequence
MD9
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 (FORM 2 -Public filing) <br /> I. LOCATION IM1IAP: Attach a USGS 7.5 minute quad,or similar map of adequate scale, which locates the prospecting <br /> site(s). <br /> J. Are prospect sites(e.g.,drill holes,trench locations,etc...)staked on the ground? Yeso No <br /> K. Specify the Land Management Agency,Address and Telephone Number: <br /> L. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br /> not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br /> USFS. Check one: <br /> ElEvidence of notification is attached to this NOI for BLM Land <br /> Evidence of notification is attached to this NOI for USFS Land. <br /> Other proof of notice is attached to this 101 <br /> II. TNIAPS & DRAWINGS SEE SITE PLAN IN EXHIBIT A FOR LOCATIONS OF NEW STRUCTURES <br /> Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br /> may submit a U.S.G.S.7.5 minute quadrangle,or similar map of adequate scale that: <br /> 3. identifies the proposed prospecting site(s)or activity areas involving surface disturbance. Activity areas include all drill holes, <br /> mud pits,excavations,trenches,adits,shafts,tunnels,rock dumps,stockpiles,impoundments and prospecting roads,and <br /> 4. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br /> are not anticipated to be affected. This includes the location of all drill holes,mud pits,excavations,trenches,adits,shafts, <br /> tunnels.rock dumps,stockpiles,impoundments and prospecting roads. Color photographs,adequately labeled(including <br /> date,orientation and location),of the prospecting site may be used to fulfill this requirement if included with the N01 <br /> submittal. <br /> III PROJECT DESCRIPTION <br /> 7. Mineral(s)and/or Resource(s)being Investigated: NO CHANGE <br /> 8. Estimated dates of commencement and completion: <br /> Commencement: NO CHANGE <br /> Completion: NO CHANGE <br /> 9. Amount of material to be extracted,moved or proposed to be moved: NO CHANGE <br /> 10. Identify the type or method of prospecting proposed and quantity(place an"X") NO CHANGE <br /> Cuts Pits Trenches <br /> Shafts Tunnels Adits 1:1Declines <br /> it Drilling Fluid Drilling Drilling&Blasting <br />
The URL can be used to link to this page
Your browser does not support the video tag.