My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 12:16:00 AM
Creation date
6/9/2014 7:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
6/6/2014
Doc Name
Response- Weekly CQA Reports for 5/3/2014 & 5/10/2014
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO' <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br /> placement; Ambient and fill temperature monitoring and recording; Underground working remediation and confirmatory <br /> drilling; Production drilling and blasting; Testing and sampling of SF,SLF, DCF and concrete from UG U6273; Rip rap <br /> placement at the Phase 1 pond spillway; and secondary underdrain installation. <br /> 11) Laboratory Activities:Laboratory testing continued with Permeability, Particle Size Distribution,Atterberg Limits, <br /> Moisture-Density relationships,gradations,material classification,identifications,and field material sampling were <br /> performed during this reporting period. <br /> The following samples were collected and returned to AMEC's laboratory for analysis; <br /> ➢ Structural Fill sample number SF-80R <br /> ➢ Drain Cover Fill sample numbers DCF 75 <br /> ➢ Sal Liner Fill sample numbers SLF 139-S and SLF-140S <br /> ➢ Physical properties test of concrete and cylinders were cast for compressive strength testing from underground <br /> working#6273 <br /> Note: Samples labeled with the suffix"R"are samples of Record/QA samples;those without are QC samples. r <br /> General Project Items <br /> Meetings and Discussions: The Contractor Meeting occurred on April 30,2014 with CC&V Projects,AMEC,and Ames. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates,reporting and scheduling are some of the tasks occurring between CC&V Projects,AMEC,and Ames. <br /> Miscellaneous: <br /> ➢ Drain cover fill processing continued. <br /> ➢ Rip rap processing continued. <br /> Deliveries:None <br /> Submitted by:Eric Lorenson Date:05-05-2014 <br /> Reviewed By: F ; --% Date:05-05-2014 <br /> Tim Burkhard <br /> Project Resident Manager <br /> Phone: 719.689.2986 <br /> Approved By: Date:S�lr /`� <br /> CC&V Projects <br /> Page 4 of 7 MLE2 WE 3 May 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.