My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 12:16:00 AM
Creation date
6/9/2014 7:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
6/6/2014
Doc Name
Response- Weekly CQA Reports for 5/3/2014 & 5/10/2014
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame& <br /> CRIPPLE CREEK&VICTOR GOLD MINING Co. <br /> Squaw Gulch (VLF),HWY 67 Realignment Field Monitoring Summary Weekly Report <br /> Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br /> Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125No. ****. **** 3 May 2014 <br /> Location: Cripple Creek & Victor Gold Mine, Colorado Revised <br /> Contractor: Ames Construction Co. Inc. <br /> Reporting Period: 4.27.14 through 5.3.14 <br /> Days S M T I W I T F S <br /> Work Shifts - D D D D D D <br /> D=Day Shift N=Night Shift W=Weather Day <br /> Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br /> High: 35°F to 62°F Cloud Cover: Partly cloudy. <br /> Low: 16°F to 37°F Precipitation: None <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the VLF. <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES and PROGRESS: <br /> I) Earthworks <br /> A) VLF(PSSA, Phase I, Phase II) <br /> Topsoil I Overburden Stripping: No topsoil stripping occurred. <br /> Production drilling: Production drilling occurred within the VLF limits. <br /> Production blasting: Four(4)production blasts occurred within the VLF. <br /> Structural Fill: <br /> A Cat 992 loader placed material into Cat 777 haul trucks at the PSSA floor downslope of stations B5+00 to B6+00, <br /> Al8+00, and ADR haul road stations 0+00 to 10+00. A John Deere 850 excavator loaded Cat 740 haul trucks with <br /> shot rock down slope of stations C1+00 to C3+00. Material from both locations was transported to the ADR haul <br /> road fill near stations 55+00 through 72+00 and placed as structural fill using a Cat D9 dozer. A Cat CS56B smooth <br /> drum roller compacted fill while a Cat 330 excavator equipped with a rock hammer broke apart oversize material. <br /> The structural fill was placed and compacted per project specification. A few select 740 loads were also hauled to <br /> the Rip Rap pre-screen stockpile. <br /> Two Cat D10 dozers pushed material downslope to the ADR haul road fill area near stations 65+00 to 70+00. The <br /> dozers placed the material as structural fill in approximately 24 inch lifts and each lift was compacted by a Cat <br /> CS56B smooth drum roller per project specification. <br /> A Cat 345 excavator loaded Cat 740 haul trucks with structural fill cut upslope of stations 116+00 to H8+00. The <br /> material was transported to the Buttress fill area near stations JO+00 to J4+00 and placed as structural fill using Cat <br /> Page I of 7 MLE2 WE 3 May 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.