Laserfiche WebLink
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Replace Topsoil <br /> Site: MMM Partnership Gravel Pit Permit Action: CN01 Permit/Job#: M2006042 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 4/25/2014 County: Logan Filename: M042-002 <br /> 9:26:45 AM <br /> User: ERR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $63.00 NA <br /> Operating Cost/Hour: $104.03 100 <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $37.41 NA <br /> Total unit Cost/Hour: $204.45 <br /> Total Fleet Cost/Hour: $204.45 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 8,631 <br /> Swell factor: 1.115 <br /> Loose volume: 9,624 LCY <br /> Source of estimated volume: Division Calculation(Y over 21.4 acres) <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 200 feet <br /> Unadjusted hourly production: 491.9 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: -10% <br /> Average site altitude: 4,180 feet <br /> Material weight: 2,100 lbs/LCY <br /> Weight description: Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.900 (AB.AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> CIRCES Cost Estimating Software <br />