Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary for Reclamation Tasks <br /> Site: MMM Partnership Gravel Pit Permit Action: CN01 Permit/Job#: M2006042 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/9/2014 County: Logan Filename: M042-000 <br /> 11:21:12 AM <br /> User: ERR <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and Grade the Site DOZER 1 76.18 $15,698.54 <br /> 002 Replace Topsoil DOZER 1 24.41 $4,990.00 <br /> 003 Rip the Buffer Area RIPPER 1 13.37 $2,822.00 <br /> 004 Revegetate the Site REVEGE 1 27.00 $27,363.26 <br /> 005 Fertilize the Site with Manure DEMOLISH 1 13.90 $1,921.39 <br /> 006 Install Fence DEMOLISH 1 16.00 $1,459.30 <br /> 007 Mobilization/Demobilization MOBILIZE 1 4.80 $2,325.29 <br /> SUBTOTALS: 175.66 $56,579.78 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $1,142.91 <br /> Performance bond: 1.05% Total= $594.09 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $5,657.98 <br /> TOTAL O&P= $7,394.98 <br /> CONTRACT AMOUNT(direct+O&P)= $63,974.76 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contractibid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.00% $3,198.74 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $10,593.72 <br /> TOTAL BOND AMOUNT(direct+indirect)= $67,173.50 <br />