My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-21_REVISION - M2006042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006042
>
2014-05-21_REVISION - M2006042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:20 PM
Creation date
6/9/2014 7:05:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006042
IBM Index Class Name
Revision
Doc Date
5/21/2014
Doc Name
Financial Warranty Calculation
From
DRMS
To
MMM Partnership
Type & Sequence
CN1
Email Name
ERR
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization <br /> Site: MMM Partnership Gravel Pit Permit Action: CNO1 Permit/Job#: M2006042 <br /> PROJECT IDENTIFICATION <br /> Task#: 007 State: Colorado Abbreviation: None <br /> Date: 4/25/2014 County: Logan Filename: M042-007 <br /> User: ERR <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/flour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: 1 $0.00 1 $25.39 1 $25.39 <br /> Total Unit Cost/Hour: 1 $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat D8T-8SU 53.08 $63.00 $125.45 1 $188.45 $125.45 $250.00 <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with Tractor <br /> Subtotals: $316.71 $214.12 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Return Trip <br /> Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.