Laserfiche WebLink
J pF•CO�O <br /> - 1p I COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> v. *x 1887 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M- 1979-142 site Name: WEST of MAYBELL PIT <br /> County M O F FAT TR# (DRMS Use onhv <br /> Perm►ttee:COLORADO DEPARTMENT of TRANSPORTATION <br /> Operator(If Other than Permittee): RECEiym <br /> Permittee Representative: Dennis Sanchez <br /> Please provide a brief description of the proposed revision: DIVISION OF <br /> Inspection of Coors Maybell Pit,revealed trash(an old dump site)that runs approximately 500'to 600'along an existing haul AqglNQA�t fcavI a trench <br /> 4'to 5'deep,36'wide,to bury this material.The trench may not reach the entire length of the inspection,CDOT wilt fence out vehicles from pit limits.C Twill gather, <br /> crush,and compact in the trench,all the existing trash that is currently located along the haul road(See attached map) COOT will fill,level,and grade this trench to <br /> match the existing contour of the surrounding ground.COOT Wit re-seed the disturbed area with the required seed mix COOT asks for a completion date of 9/3012014. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) , <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 11 Od, 112d(l, 2 or 3) $1006 ❑ <br />