Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No topsoils are present on any of the waste dumps proposed for sampling. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />All hand dug holes, auger holes and backhoe pits will be backfilled with the excavated <br />material. No drill core holes are proposed. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Please see the attached Exhibits for details. In summary, the sample sites will be <br />backfilled with the excavated material and compacted. If the sample sites are sampled <br />material. with an auger or backhoe, the sample sites will be covered with a landscape <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />No now roads are proposed So none will be- re-Glaimed- No upgrade to existing roads ace <br />proposed. <br />