My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-03_PERMIT FILE - P2014009 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014009
>
2014-06-03_PERMIT FILE - P2014009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:30 PM
Creation date
6/6/2014 8:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014009
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2014
Doc Name
New NOI Form 2
From
New West Reclamation, LLC
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structures: <br />None needed <br />3.1.4 Public Use: <br />On lands owned by the Operator, the Operator may permit the public to use the same for <br />recreational purposes, except in areas where such use is found by the Operator to be <br />hazardous or objectionable: <br />The proposed affected areas are patented mining claims controlled by New West Reclamation, <br />LLC. The proposed prospect area is not fenced and is accessed by both public and historic <br />private roads. New West Reclamation, LLC has not attempted to control public access. <br />3.1.5 Reclamation Measures — Materials Handling: <br />(1) Grading shall be carried on so as to create a final topography appropriate to <br />the final land use selected in the Reclamation Plan: <br />Once a proposed waste dump sample location is sampled, the affected area will be <br />regraded to blend in with the adjacent waste dump surface. The disturbed area will be <br />covered with jute netting, burlap or other suitable material to control erosion. The <br />erosion fabric will be secured with landscape staples according to the manufacture's <br />recommendation. No topsoil shall be replaced since no topsoil presently exists on the <br />proposed sample locations. (The exception to concurrent sample site reclamation will be <br />sampling completed during winter or snowfall months. During the winter sampling, we <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.