My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-03_PERMIT FILE - P2014009 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014009
>
2014-06-03_PERMIT FILE - P2014009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:30 PM
Creation date
6/6/2014 8:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014009
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2014
Doc Name
New NOI Form 2
From
New West Reclamation, LLC
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3.1 Reclamation Performance Standards: <br />3.1.1 The Post Mining Land Use: <br />This is a proposed prospecting operation. The post prospecting use will remain wildlife habitat. <br />3.1.2 Reclaiming Substituted Land: <br />No substitute lands are proposed for reclamation. <br />3.1.3 Time Limit and Phased Reclamation: <br />(2) All reclamation shall be carried to completion by the Operator with all <br />reasonable diligence, and each phase of reclamation shall be completed within five <br />(5) years from the date the Operator informs the Board of Office that such phase <br />has commenced: <br />This is proposed as an up to two year+ project, although the activity may take longer <br />depending on weather and other circumstances. <br />We propose there will be 15 sampled sites on the waste dump. Surface reclamation will <br />consist of shaping each small disturbed area to match the adjacent waste dump surface. <br />Surface reclamation will occur after bulk samples are taken. Markers will be placed at <br />each sample point for future reference. (The exception to concurrent sample site <br />reclamation will be sampling completed during winter or snowfall months. During the <br />winter sampling, we will complete what backfilling and other sample site reclamation is <br />logical to complete, given site specific conditions. The winter sampled sites will be <br />checked in the spring, after snow melt, for implementation of *any corrective actions <br />necessary to stabilize the site.) <br />Since the combined production during prospecting will be less than 70,000 tons per year, <br />an air quality permit will not be needed. In addition, an APEN will not be filed since the <br />estimated particulates generated will be less than 2 tons per year. <br />A Water Quality Discharge Permit should not be required since no process water will be <br />involved. However, a Storm Water Management Plan (Attachment V) and Storm Water <br />Permit from the Colorado Department of Public Health and Environment, Water Quality <br />Control Division will be obtained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.