Laserfiche WebLink
COLORADO DIVISION OF WATER RESOURCES GWS46 MONINST (1112011) <br />DEPARTMENT OF NATURAL RESOURCES <br />MONITORING /OBSERVATION WELL PERMIT APPLICATION INSTRUCTIONS <br />Applications must be computer generated on -line, typewritten or printed in BLACK or BLUE INK. ALL ITEMS in the application must <br />be completed. Incomplete applications may be returned for more information. Applications are evaluated in chronological order. <br />Please allow approximately six weeks for processing. This form may be reproduced by photocopying or computer generation. <br />Reproductions must retain margins and print quality of the original form. If filing online, see online filing instructions for further information. <br />You may also save, print, scan and email the completed form to. dwmermitsonlinet'a.state.co.us <br />FEES: This application must be submitted with a $100 filing fee. (The fee for an application to replace or deepen an existing permitted <br />monitoring /observation well is $100 for locations outside Designated Ground Water Basins, and $60 inside Designated Ground Water Basins.) <br />Acceptable forms of payment are check or money order, payable to the "Colorado Division of Water Resources." Payments made by Visa. <br />MasterCard or Discover card can be accepted by phone through the Records Section at 303.866.3581. Fees are nonrefundable. <br />USES: This form (GWS -46) is to be used when applying for a permit where the only uses are monitoring of water levels and/or water <br />quality sampling. For well construction criteria refer to the Colorado Water Well Construction Rules, 2CCR 402 -2. A copy of the Rules may <br />be obtained from any Division of Water Resources Office for a fee of $5, or you may access them online from the State Board of <br />Examiners' (BOE) website at htto: //water. state. co. us /dwril)ub/ documents /constructionrulesO5.pdf <br />ITEM INSTRUCTIONS: (numbers correspond with those on the front of this forml <br />1. Provide the name of the well owner and the mailing address where all correspondence will be sent. <br />2. Check and complete all boxes that apply. <br />3. Provide the MH number assigned by the Division of Water Resources in response to the notice of intent to construct a <br />monitoring /observation well. Complete the well name if the structure has a name or identifying number. <br />4. If applying for a permit to construct a new well, you must provide the county, section #, township, range and principal meridian. You <br />do not need to provide the % of the Y, section designation, distances from section lines or an optional GPS location (UTM <br />coordinates). If a permit is issued and a well constructed, the authorized individual will be required to provide an accurate GPS <br />location (UTM coordinates) of the "as- built" well location If applying for a permit to use an existing well you must provide the well <br />location information stated above, as well as either a GPS location (UTM coordinates) of the existing well site, or distances from <br />section lines (including the '/4 of the 1/4 section designation) as follows: In a typical case, a township is comprised of 36 sections, <br />with each section ideally one mile square, or 5,280 feet on each side. Sections are further divided into quarter sections. Each X <br />Section is 2,640 feet by 2,640 feet and comprises 160 acres. Each %, section can be further divided into additional quarters. Each X <br />of the % Section is 1,320 feet by 1,320 feet and comprises 40 acres. The distances are measured from the section lines. In the <br />following example, the well is located 2,500 feet from the South Section line and 1,400 feet from the East Section line: <br />5. <br />6. <br />7. <br />B. <br />9. <br />10. <br />5280 n <br />JL <br />NOM 5eoIan line <br />NW1 /4 NE1 /4 <br />2640 I1 <br />1 <br />13210 h <br />---------- - - - - -- 3 ------ ,--------- <br />i <br />NOM 5eoIan line <br />NW1 /4 NE1 /4 <br />---------- - - - - -- 3 ------ ,--------- <br />NW1/4 <br />NE 1/4 <br />SE1 /4 <br />SE1 /4 <br />SW114 :- --- -.- -' <br />SWI14 <br />SE 114 <br />SE 114 <br />SE 114 <br />Sam secom tin <br />Well Location Example: <br />NW1 /4 of the SE1 /4 of <br />Section 3, being 2500 feet <br />from the South Section Line <br />and 1400 feet from the East <br />Section Line. <br />If providing a GPS location (UTM coordinates), the required GPS unit settings must be as indicated on this form. Colorado contains <br />two UTM zones (12 & 13). Zone 13 covers most of Colorado. The boundai between Zone 12 and Zone 13 is the 108'" Meridian <br />(longitude). West of the 108`' Meridian is UTM Zone 12 and east of the 108 Meridian is UTM Zone 13. The 108'" Meridian is <br />approximately 57 miles east of the Colorado -Utah state line. On most GPS units, the UTM zone is given as part of the Easting <br />measurement, e.g. 12T0123456. Check the appropriate box for the zone. Provide the property address of the well location if one <br />exists. If it is the same as the mailing address, check the box next to the well location address. <br />Provide property owner information. <br />Use of this well is limited to monitoring water levels and /or water quality sampling only. <br />The actual or anticipated total depth must be provided. Provide the name of the aquifer in which the well will be completed. <br />Provide consultant information (if applicable). Note: A consultant may sign this application on behalf of their client. <br />Monitoring /observation wells must be constructed by a Colorado licensed well construction contractor or authorized individual, as defined <br />in the Well Construction Rules, 2CCR 402 -2. Only a licensed contractor may construct any monitoring /observation well that penetrates a <br />confining layer, or, is to be converted into a future production well. The well must be constructed in compliance with the Well Construction <br />Rules, unless a variance has been approved allowing an alternative construction design. <br />The individual signing the application or entering their name (and title if applicable) must be the applicant or an officer of the corporation/company /agency <br />identified as the applicant, their attorney or consultant. An authorized agent may also sign the application, if a letter signed by the applicant or their attorney <br />is submitted with the application authorizing that agent to sign or enter their name on the applicant's behalf. Payment must be received via phone, fax or <br />mail prior to processing the application. If filing online please call the Records Section at 303.866.3581 to pay via credit card. <br />IF YOU HAVE ANY QUESTIONS regarding any item on the application form, please call the Division of Water Resources Ground Water <br />Information Desk (303 -866- 3587), or the nearest Division of Water Resources Field Office located in Greeley (970- 352- 8712), Pueblo <br />(719 -542- 3368), Alamosa (719 -589- 6683), Montrose (970- 249 - 6622), Glenwood Springs (970- 945 - 5665), Steamboat Springs (970 -879- <br />0272), or Durango (970- 247 - 1845), or refer to CDWR web site at http:/ /www.water.state,co.us for general information. <br />