My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-04_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2014-06-04_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:31 PM
Creation date
6/4/2014 9:55:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
6/4/2014
Doc Name
Bond Release Request
From
Seneca Coal Company
To
DRMS
Type & Sequence
SL6
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRB -5 (269.3 acres). Hence the standard that there would be at least 5% of the Phase III BRB block with <br />at least 1,000 stems per acre has been met for 2012. <br />A reverse t-test of the assertion that the 2012 BRB -5 Background woody plant density is indistinguishable <br />from 90% of the standard is as follows: <br />x — (0.9 = tech -Wcal standard) <br />tcaic = <br />r1�) <br />t,t, alc — _210.4 -90 =2.23 <br />392.5 <br />Since critical t = 0.850 (one - tailed, alpha = 0.2, 53 -1 df) and ta,, is greater than this critical value, the <br />hypothesis of no difference is rejected and reclamation success for 2012 BRB -5 background woody plant <br />density under Phase III is demonstrated. <br />A reverse t-test of the assertion that the 2011 BRB -5 Concentration Area woody plant density is <br />indistinguishable from 90% of the standard is as follows: <br />z — (0.9 = technical standard) <br />tGQtG _ — <br />(;�n) <br />t = 4 <br />1614.7 - 900 =.07 <br />cQ is 1278.8 <br />k 53 ) <br />Since critical t = 0.850 (one - tailed, alpha = 0.2, 53 -1 df) and Ui, is greater than this critical value, the <br />hypothesis of no difference is rejected and reclamation success for BRB -5 2012 woody plant <br />concentrations areas under Phase III is demonstrated. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.