Laserfiche WebLink
a <br /> Mr. Caccamise <br /> Page 12 <br /> April 2,2014 <br /> for sources of metal contamination, the prospector will be investigating a mineral deposit <br /> with the intent of developing or extracting said mineral deposit. <br /> 4. The Applicant did not specify the amount of material to be extracted or moved. Please <br /> specify the amount of material, in cubic yards,to be extracted. <br /> 5. The Applicant has stated two drill pads will be constructed. Please provide a description of <br /> how the drill pads will be constructed, this information is necessary to calculate the costs <br /> associated with reclaiming the drill pads. <br /> 6. The Applicant has stated that the drill sites and roads will be graded and revegetated per the <br /> USFS recommendations. Please provide the Division with any recommendations you have <br /> received from the USFS. <br /> 7. The Plan of Operations (POO) which was submitted with the NOI Application states that a <br /> water truck will be utilized for this project. Please specify how the water will be used in this <br /> project. In addition, specify the source of the water and the estimated volume of water to be <br /> used. <br /> 8. The Project Description in the attached POO includes the following statement: Rotary <br /> drilling; maximum 10,000 feet. Please clarify if `10,000 feet' refers to the elevation at which <br /> drilling will be conducted. <br /> 9. The POO states that drill cuttings will be transported to logging sheds at the mill site. The <br /> POO also states that the logging sheds will be mounted on an old building foundation on the <br /> mill site claim. Please confirm that the mill site claim is located on USFS property. Also, <br /> specify the number of sheds to be erected and provide the dimensions of the sheds as well as <br /> the materials used to construct the sheds, i.e. corrugated metal,plywood,concrete blocks. <br /> Since these structures will be used in conjunction with the prospecting operation, the <br /> Division must bond for their removal. Finally, describe how the mill site claim is accessed, is <br /> there an existing access road? <br /> 10. The POO references Drill Hole#3 which was completed in 2003. Please clarify how the <br /> existing drill holes on Webster Pass relate to the proposed Red Cone project. <br /> 11. The POO states that water will be pumped from Handcart Gulch. The applicant must <br /> demonstrate a legal right to divert and consume water from Handcart Gulch. In addition, you <br /> must specify the vo ume of water to be diverted and the intended use of the water. Also, <br /> describe all conveyances used to pump water to the drill pads and provide the dimensions of <br /> all piping to be used. <br /> 12. The POO states that drilling fluids will be transported from the site. This statement <br /> contradicts information provided in the NOI Application,which specifies air drilling. Please <br /> clarify if drilling fluids will be produced as a result of the proposed drilling operation. <br />