Laserfiche WebLink
I CMC—Henderson Operations <br /> 5-Quarter Water Quality Data and Baseline Parameters Report <br /> May 2014 <br /> 5.0 Conclusion <br /> Henderson has completed additional groundwater studies at the Mill and has determined that two additional <br /> ' locations,MLGW-15 and MLGW-17,are appropriate as long-term POC monitoring locations.Additionally, <br /> Henderson has completed baseline parameters monitoring and related NPL assessments for existing POC <br /> location MLGW-ACR and the new proposed POC locations MLGW-15 and MLGW-17. A parameter list <br /> and NPLs have been developed for these locations. <br /> ' Upon DRMS approval,Henderson will begin monitoring at these locations and proposes to insert the <br /> parameter lists,NPLs and sampling frequency for each location into Section 5.1.2 and Section 6.2 of the <br /> GWMP in order to consolidate the information in a single location and simplify overall administration of the <br /> GWMP. Upon concurrence from the DRMS,Henderson will submit appropriate revisions to the GWMP. <br /> Page 8 of 9 <br />