My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-02_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2014-06-02_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:28 PM
Creation date
6/2/2014 12:57:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/2/2014
Doc Name
Letter Application and Public Notice
From
New Elk Coal Company
To
DRMS
Type & Sequence
TR70
Email Name
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r3i <br />RDA ACCESS ROAD PROCEDURE <br />OVERVIEW <br />This document details the procedure for using the RDA access road either by light vehicles, ATVs <br />( Gators) or haul trucks. <br />Rules <br />• The RDA access road may be used by ATV (gators), light vehicles, dozers, graders and haul <br />trucks, water trucks and other vehicles suitable for the road conditions <br />• The RDA access road may only be used by haul trucks and water trucks during dry conditions <br />(no rain or snow) and during daylight hours. <br />• Only one vehicle is to use the RDA access road at a time <br />• Signs must be clearly visible at the top and bottom of the haul road. The sign is to show <br />"Single vehicle on road only. Radio on channel 1 prior to entry and following exit" <br />• Berms and guards on outer banks on elevated roadways must be intact (as per 77.1605(k) <br />PROCEDURE <br />1. Prior to crossing highway 12 or entering the top of the RDA access road (At the RDA end), <br />vehicle operators must advise on radio channel 1 that they are entering the RDA access road. <br />Words to be used are: "haul truck / light vehicle / gator entering RDA access road ". <br />2. The equipment operator must wait at least 30 seconds to allow time for a response from <br />anyone on the RDA access road. <br />3. After clearing the RDA access road at either end, the equipment operator must advise on <br />radio channel 1 that the RDA access road is clear. Words to be used are: 'RDA access road is <br />now clear ". <br />4. Any defects in the RDA access road must be reported immediately with an assessment made <br />as to what vehicles may use the road prior to the remediation of any defects. <br />NECC HSEC R &R 003 Status: Published Effective: 06/06/2013 Page 1 of 1 <br />RDA Access Road Procedure Version: 1.1 Review: 8122113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.