Laserfiche WebLink
GCC Energy, LLC <br />A cutting pit will be constructed to capture the cuttings for replacement into the completed borehole prior <br />to plugging the hole, and would be reclaimed to pre- disturbance condition, or as specified by BLM and /or <br />the UMU tribe. Cuttings pits would be located away from natural depressions and watercourse in a <br />manner that prevents natural runoff from entering the pit. Cuttings pits would be constructed with a <br />capacity adequate for the anticipated volume of effluent. Topsoil would be removed and stockpiled prior <br />to mud pit excavation to prevent contamination, minimize erosion loss, and to aid in reclamation. <br />GCC does not anticipate the excavation of trenches or test pits as part of the exploration plan. Drill hole <br />depth, length of access roads, length of rotary drilling, and length of core drilling per hole are listed in <br />Table 2. <br />Table 2. Drill Hole Depths <br />Hole # <br />Total <br />Depth <br />(feet) <br />GCC -14 -01 <br />90 <br />GCC -14 -02 <br />260 <br />GCC -14 -03 <br />270 <br />GCC -14 -04 <br />215 <br />GCC -14 -05 <br />250 <br />GCC -14 -06 <br />310 <br />GCC -14 -07 <br />275 <br />GCC -14 -08 <br />330 <br />GCC -14 -09 <br />330 <br />GCC -14 -10 <br />290 <br />GCC -14 -11 <br />305 <br />GCC -14 -12 <br />295 <br />GCC -14 -13 <br />255 <br />GCC -14 -14 <br />295 <br />GCC -14 -15 <br />235 <br />GCC -14 -16 <br />160 <br />GCC -14 -17 <br />190 <br />GCC -14 -18 <br />220 <br />GCC -14 -19 <br />190 <br />GCC -14 -20 <br />195 <br />GCC -14 -21 <br />220 <br />GCC -14 -22 <br />215 <br />GCC -14 -23 <br />220 <br />GCC -14 -24 <br />190 <br />Federal Coal Exploration Plan <br />May 2014 <br />5 <br />