Laserfiche WebLink
h <br />* 187& <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 Phone (303) 866 -3567 <br />U TEMPORARY CESSATION NOTICE <br />(mining activities temporarily cease for more than a one -year periodRECEIVED <br />Today's date: May 19, 2014 <br />MAY 2 9 2014 <br />Permit number: M- <br />County: Pueblo <br />Permittee making <br />Site name: Barnhart Pit Division of Reclamation, <br />Mining & Safety <br />TC number: (DBMS use onto <br />Continental Materials Corp <br />Operator (if other than permittee): <br />Date the initial five -year period of Temporary Cessation begins: <br />May 19, 2014 <br />Reason mining activities (materials extraction, processing, hauling) have ceased: <br />Sand and gravel materials from the Pueblo East Pit is more conveniently conveyed to the processing plant. <br />Description of plan to resume operations: <br />When the closer Pueblo East material is depleted, the Permittee will file an amendment to this permit <br />to expand the affected area into leased property. <br />Description of plan to meet performance standards of Rule 3.1 during temporary cessation (reclamation, weed control, <br />monitoring, signs, markers, etc.): <br />Presently only 1/3 of the 67.8 acre permit is disturbed. The pond banks and OB piles have revegetated and <br />no erosion is occurring. Russian Olive and Tamarask growth will be controlled. <br />Number of affected acres: 23 <br />Amount of financial warranty (bond) on deposit with the state: $ 69,470 <br />Required fees for Temporary Cessation by permit type (please mark the correct fee and submit it with this request <br />for Temporary Cessation): <br />Permit type Required TR fee Submitted (mark only one) <br />Construction Materials $144 <br />Hard Rock/ Metal Mining $115 <br />The above - referenced permit has entered Temporary Cessation. This site has reserves remaining to be mined. <br />Operator's signature: <br />Please note: <br />1. While in Temporary Cessation, the operator must continue to comply with the Rules andAct, includifECEIVED <br />maintaining the site, and must continue to file an annual report and annual fee. <br />✓A o-LL)Cj � C - <br />✓ ,IUO Ifola_fi o ns <br />MAY 2 9 2014 <br />Division of Reclamation, <br />Mining & Safety <br />