Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 25 of 34 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />6500.00 <br />-10.70 <br />3.00 <br />-7.70 <br />1749 <br />3.831 <br />2 <br />3100.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.128 <br />3 <br />1000.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />0.191 <br />Haul Time: 5.150 minutes <br />Return Rnute: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />1000.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />0.410 <br />2 <br />3100.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.079 <br />3 <br />6500.00 <br />10.70 <br />3.00 <br />13.70 <br />1274 <br />5.147 <br />Loading Tool unit <br />Production 437.36 <br />Truck Unit Production <br />45.14 <br />Optimal No. of Trucks: 10 <br />Return Time: 6.636 <br />Total Truck Cycle Time: 14.146 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: _ <br />Truck(s) Selected Number of Trucks: _ <br />Adjusted hourly truck team production: 149.86 <br />Adjusted single truck/loader team production: 149.86 <br />Adjusted multiple truck/loader team production: 149.86 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.701 /LCY <br />minutes <br />minutes <br />363.01 LCY/Hour <br />37.47 LCY/Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 108.83 Hours <br />Total job cost: $44,049.55 <br />CIRCES Cost Estimating Software <br />