Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Technical Revision No.77 Page 16 of 34 <br />Haul Rnnte- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />325.03 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />500.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />0.482 <br />Haul Time: 0.482 minutes <br />Return Rnnte7 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />325.03 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />500.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />0.195 <br />CIRCES Cost Estimating Software <br />Return Time: 0.195 <br />minutes <br />Total Truck Cycle Time: 3.257 <br />minutes <br />Loading Tool unit <br />Production <br />391.61 <br />LCY/Hour Adjusted for job efficiency: <br />325.03 LCY/Hour <br />Truck Unit Production <br />202.00 <br />LCY/Hour Adjusted for job efficiency: <br />167.66 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />1 Truck(s) <br />Adjusted hourly truck team production: 167.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 167.66 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 167.66 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 50.03 <br />Hours <br />Unit cost: <br />$1.068 <br />/LCY Total job cost: $8,958.53 <br />CIRCES Cost Estimating Software <br />